Workmen standing in the bottom part of the the partially constructed Queensway Tunnel, beneath an experimental length of reinforced concrete, which would form the roadway
- Date:
- 20 Sep 1929
- Location:
- Queensway Tunnel, Liverpool
-
Show all locations
Mersey Tunnel, Liverpool
- Reference:
- MTA01/01/06
- Type:
- Photograph (Print)