A view of men beside a pile driver and a pile being load tested, during the construction of the Ford Motor Works
- Date:
- 1930 - 1939
- Location:
- Ford Motor Works, Barking And Dagenham, Greater London Authority, RM9
- Reference:
- AL0185/019/03
Explore 6 million historic aerial photographs covering all of England.
The projects will explore untold stories at the heart of our history.
Around 20,000 concrete piles were driven into the ground of a site on marshland at Dagenham during the construction of Dagenham Ford between 1929 and 1931.
This is part of the Volume: AL0185 Album of photographs of civil engineering projects; within the Collection: ALB19 Album of photographs of civil engineering projects
Source: Historic England Archive
20th Century Car Factory, Construction, Engineering, People